Has the minimum envelop size and weight, buthigher operation efficiency and better performance than others.
Various optional kits:low-temperature kit for arctic peration, clamp head incline kitfor special land rig, "one-button" control kit, retrofit kit forland/ offshore rig integrated control system.
Automatically identify drilling tool joint with machine vision anddeep learning algorithm. "One button" fully automatic mode speed upoperation greatly
Patented continuous chain spinner greatly reduces damage to thepipe. Patented torque wrench adapts to different pipe sizes without replacing dies, and minimizes damage to pipejoints.
Average work life extended up to 1000 ~ 1500 hoursProvides better and safersolution in high temperature, high pressure and high rotation speed workingconditions.
Seal rings replacement takes 10 minutes or lessSignificantly improvesefficiency and safety, and reduces labor intensity.
The wash pipe is customized to fit specific top drive or swivel byproviding the make and model, or related interface information.
Withstands 120℃ and 7,500 psi working condition.
Fully isolated tank andbreathing bladder, extends the service life of hydraulic fluid and hydrauliccomponents of equipment.Electrical control andhydraulic systems are top-of- the-line quality, highly reliable and easy tomaintain
Patented load-sensitivecontrol technology, to match load power automatically. Enters low flow modewhen standby to reduce temperature rise. Average energy consumption can bereduced by 80%.High performed hydraulic valves, fittings and seals, standardizedworkflow and strict controls of quality to prevent leakage.
Modular design, interfacefor rig system integration reserved. Provides different models for varioussituation, customizable upon request.
With dual /single plunger steerable tool interchange function
With zero-degree build-up function
With high-precision near-bit well deviation and azimuth gammameasurements
High- precision tilt stabilization
High build-up rate, stable average build-up rate higher than11degree/30m
Motor can be attached to improve the bit RPM lower than 260r/min
Can be connected with formation parametermeasuring instruments such as electromagnetic wave resistivity
Develop the MPD system which could complete nearly andunderbalanced drilling, flow monitoring, CBHP (constant bottom hole pressure)
Auto-choke manifold
Back-pressure pump (BPP) compensation manifold
Hydraulic and pneumaticcontrol system
Monitor and auto-controlsystem software
Drilling
Connection
Tripping up & Going down
BOP maintenance
Lost circulation
Kill well
Decrease ECD
Well start up
Oil and Gas industryproduction bring the pressure of environmental protection. Sagta provides full consulting service in waste oil, water and solid waste treatment technology and BOT service
Refineryis a continuous production process. Sagta presents the best practices to reduce the down time and savingenergy
Concentration reduction and solidification and drying treatment of terminal water
Sludge drying and sewagetreatment
Recycling water sewagetreatment
Dirty oil sludge of Cleaning tanks
4Drill mud continuousharmless treatment